Well week two on the shop is below just about done with the walls only one to go :)
Wall up see pix at Walls Done
Jack got the rear wall done while I was home
Jack putting up the insulation on Monday
Insulation done on that side just the spot for Jack's AC unit left open
Finishing up on the other side :)
:Jack marking where the studs are for the sheetrock
Measuring the sheetrock for the right side of the door way
First piece on that wall is in place
And then there were two in place :)
And up goes number 3. these 12' sheets he cut down to 10' are so much less work and less dusty looking at rather than being there :)
We did not get back to finish until Wednesday :) Measuring for the insulation for the door way and other side of the door to finish the wall (taken from inside the garage)
But first need another board for the Insulation to mount on
Getting up the insulation
Sheetrock over the doorway from back
Measuring where to screw and cut out door way
Sheetrock over door way from inside shop
Jack getting ready to cut out the door way
Last pictures before I caught the piece
Jack once more surveying his work:)
Getting up the insulation for the other side of the door way that will finish that wall :)
Jack likes to jump around so adding small missing piece to end of wall before finishing the door way
Jack discovered he had to do the piece on the back wall before he could finish the other one by the door way
Many side steps later back to our regularly schudled wall by the door way:)
Cutting out the other side of the door way
Jack once more excamining his work
One piece to go on the back wall
Only the one side wall to go now :)
Come
back when we finish the shop then the ceiling and then have the sheetrock
mudded and tapped and then we paint I will take pix of it all :)